Modules and Skids
Burak Sanayi has had hands-on experience in fabrication and pre-installation of the modules and skids, the growing engineering trend in piping industry.
The process includes pre-installation of pipe spools on pipe rack-type steel structures, trial-assamble and hydrotest the system, then cut the intermodular joints and shipment to site. The size of these skids/modules might vary from that of a 20-ft. container to a couple of thousand tons.
This is where two lines of work meets: Structural steel and pipe spools. Burak Sanayi makes use of its vast experience and skills in bothe fields, and thus offers even more productive solutions for this growing industry.